Portfolio


We do amazing stuff

Mauris eget quam orci. Quisque porta varius dui, quis posuere nibh mollis quis. Mauris commodo rhoncus porttitor. Maecenas et euismod elit. Nulla facilisi. Vivamus lacus libero, ultrices non ullamcorper ac, tempus sit amet enim. Suspendisse at semper ipsum. Suspendisse sagittis diam a massa viverra sollicitudin. Vivamus sagittis est eu diam fringilla nec tristique metus vestibulum.

Venetian Causeway Bridge Rehabilitation No. 874459
Miami, FL

Venetian Causeway Bridge Rehabilitation No. 874459 Client: Miami-Dade County Location: Miami, Florida Construction: 2015 – 2016 The work included all design and construction services necessary to rehabilitate the westernmost portion of Bridge No. 874459/Venetian Causeway (Bridge) in Miami-Dade County by removing and disposing, in an artificial reef, approximately 730’-9” of the bridge’s westernmost superstructure and

Veterans Expressway Widening,
Tampa, FL

Veterans Expressway Widening Client: FDOT/Turnpike Enterprise Location: Tampa, Florida Construction: 2013 – 2016 This project consists of widening of Veterans Expressway from four (4) lanes divided to eight (8) lanes divided, including conversion of mainline to all electric tolling system between Milepost 7.160 to Milepost 9.000 in Hillsborough County, FL. Work includes clearing & grubbing,

All Electronic Tolling at Veterans Expressway,
Tampa, FL

All Electronic Tolling at Veterans Expressway Client: FDOT/Turnpike Enterprise Location: Tampa, Florida Construction: 2013 – 2015 Project consisted of conversion of the existing conventional Sunpass/Cash Toll collection system on the Veterans Expressway to an All Electronic Toll (AET) collection system for mainline (one location) and ramps (4 locations) between north of Gunn Highway and Dale

Ocean Avenue (Lantana) Bridge
over Intracoastal Waterway
Lantana, FL

The scope of work consists of reconstruction of Ocean Avenue (Lantana) Bridge over Intracoastal Waterway. Includes demolition of existing bridge. New bridge is movable and fixed span structure.

SR-30 (US 98) over Aucilla River
Bridge Replacement Taylor County, FL

SR-30 (US 98) over Aucilla River Bridge Replacement Client: Florida Department of Transportation Location: Taylor County, FL Construction: 2011-2013 Description: The project consists of installation of a temporary detour bridge, work platform, demolition of two existing bridge structures, the construction of a 1,400 LF new bridge structure and the accompanying roadwork items in Taylor County,

I-595 Corridor Roadway Improvements
Broward County, FL

I-595 Corridor Roadway Improvements Client: Florida Department of Transportation Location: Broward County, FL Construction: 2009-2014 The project consists of the reconstruction and resurfacing of the I-595 mainline, including the addition of auxiliary lanes (and all associated improvements to adjacent cross-roads, frontage roads and ramps), and a new express lanes system in the I-595 median. The

Construction of New Port at Galeota
Trinidad & Tobago

Construction of New Port at Galeota Owner: National Energy Corporation (NEC) Location: Trinidad & Tobago Construction: 2008-2014 The project consists of design and construction of new port facilities at Galeota, in the southern tip of Trinidad, near the village of Guayaguayare. The existing facilities are obsolete and not capable of supporting the requirements of all

Bulkhead & GCC Canal Dredging Operation
Port St. Joe, FL

Bulkhead & GCC Canal Dredging Operation Client: Port St. Joe Port Authority Location: Port St. Joe, FL Construction: 2008-2009 Construction of 1,042 LF steel sheet pile bulkhead wall, steel sheet pile tie-back wall, concrete bulkhead cap and rip-rap. Also includes 50,000 CT dredging for berth deepening in Gulf County Canal.

Alutrint Material Storage Material & Handling EPC Contract

Alutrint Material Storage Material & Handling EPC Contract Client: National Energy Corporation (NEC) Location: Trinidad & Tobago Construction: 2008-2010 The project consists of design and construction of a raw material handling and storage facility, purchased and constructed to unload bulk alumina and coke at the harbor with traveling unloaders, and transport the materials by conveyor

Miami Intermodal Center Bridge 10A
Miami, FL

Miami Intermodal Center Bridge 10A Client: FDOT/Turner Construction Location: Miami, Florida Construction: 2007-2011 Located next to the Miami International Airport, the Miami Intermodal Center is a massive ground transportation hub being developed by the Florida Department of Transportation. To be completed by 2011 the MIC Program consists of a Rental Car Center, the Miami Central

Bulkhead Seawall and Retaining Wall
Stock Island, Key West, FL

Bulkhead Seawall and Retaining Wall – Stock Island, Key West Client: Florida Keys Aqueduct Authority Location: Stock Island, Key West, Florida Construction: May 2008 – Oct. 2008 Construction of 1,200 LF of bulkhead seawall and 200 LF of retaining wall. GLF Construction proposed a Value Engineering Contractor Proposal (VECP) to the Florida Keys Aqueduct Authority

New River Bridge
Fort Lauderdale, FL

Fort Lauderdale New River Bridge Client: Tri-County Commuter Rail Authority Location: Fort Lauderdale, Florida Construction: 2003-2006 This project for the Tri-County Commuter Rail Authority consists of a new twin-track high level fixed bridge over the South Fork of the New River, positioned within the existing right-of-way. This project is located in Broward County, FL. MAJOR

US-17 Wilmington Bypass
Wilmington, North Carolina

US-17 Wilmington Bypass Client: North Carolina Department Of Transportation Location: Wilmington, North Carolina Construction: 2001-2006 This project for the North Carolina Department of Transportation called for the construction of 4.25 kilometers of four lane divided highway around the north side of Wilmington, North Carolina. The project was fully funded by the State of North Carolina.

Berths 14 & 15 Wall Stabilization
Fort Lauderdale, FL

Port Everglades Berths 14 & 15 Wall Stabilization Owner: Board of County Commissioners of Broward County Location: Fort Lauderdale, Florida Construction: 2002—2003 This project for the Broward County Pt. Everglades consisted of of anchor wall reinforcement, installation of approximately 950 ft. of steel pile and connecting to the existing anchor wall. Provide and install 40’X60′

US-183 and Bolm Road Overpass
Austin, Texas

US 183 and Bolm Road Overpass Client: Texas Department of Transportation, Austin District Location: Austin, Texas Construction: 2001—2003 This TX DOT project converting a non-freeway facility to a freeway facility entailed construction of 1.3 miles of new roadway, over 200,000 cubic yards of embankment, and 95,000 square foot of retaining wall. Major quantities: 8,337 LF

Blair Stone Parkway Road Extension – Phase I
Tallahassee, Florida

Blair Stone Parkway Road Extension – Phase I Client: City of Tallahassee Location: Tallahassee, Florida Construction: 2001—2003 This contract for the City of Tallahassee, included the construction of 2.92 kilometers of a divided 4-lane urban roadway including the construction of twin 317 meter long precast concrete girder bridges across wetlands and a CSX railroad track.

SR 10 Escambia River Bridges
Pace, Florida

SR 10 Escambia River Bridges Client: Florida Department of Transportation, District 3 Location: Pace, Florida Construction: 2001—2004 This project for the Florida Department of Transportation, District 3, included in the scope of work the widening of an existing structure to accommodate four lanes of traffic, a traffic switch to the widened bridge, followed by demolition

US 41/SR 45 Hachett Creek Bridge
Venice, Florida

US 41/SR 45 Hachett Creek Bridge Client: Florida Department of Transportation, District 1 Location: Venice, Florida Construction: 2001—2005 This project for Florida Department of Transportation, District 1, included the construction of a new double leaf bascule bridge to replace the existing two-lane bascule bridge. Construction included drilled shaft installations, mass concrete placement, bascule steel fabrication

DART North Central Corridor
Section NC-3 Line
Dallas, Texas

DART North Central Corridor, Section NC-3 Line Client: Dallas Area Rapid Transit (DART) Location: Dallas, Texas Construction: 1999—2002 This project for the Dallas Area Rapid Transit Authority (DART) included the extension of the existing rail transit system, a distance of four miles north of Dallas. Construction includes approximately 21,640 LF of guideway including elevated and

SR 291 Carpenter’s Creek Bridge
Pensacola, Florida

SR 291 Carpenter’s Creek Bridge Client: Florida Department of Transportation, District 3 Location: Pensacola, Florida Construction: 2001—2003 This project for the Florida Department of Transportation, District 3, included the replacement of the low level Carpenter’s Creek Bridge in Pensacola, Florida. The structure is 30 meters in length and 24 meters wide with associated roadway work

Sidney Lanier Bridge
Brunswick, Georgia

Sidney Lanier Bridge Client: Georgia Department of Transportation Location: Brunswick, Georgia Construction: 1997—2002 This project for the Georgia Department of Transportation is a joint venture between GLF Construction Corporation and Recchi America, Inc. The scope of work included the construction of the main cable-stayed span of the Sidney Lanier Bridge, protective rock islands for the

Hallandale Beach Bascule Bridge
Hallandale Beach, Florida

Hallandale Beach Bascule Bridge Client: Florida Department of Transportation, District 4 Location: Hallandale Beach, Florida Construction: 1998—2003 This project for the Florida Department of Transportation, District 4, called for the construction of a new double-leaf bascule bridge across the Intracoastal Waterway, at Hallandale Beach, Florida. The phasing of the project called for the construction of

DART Northeast Corridor, Section G-2 Line
Dallas, Texas

DART Northeast Corridor, Section G-2 Line Client: Dallas Area Rapid Transit (DART) Location: Dallas, Texas Construction: 1999 — 2002 This project for the Dallas Area Rapid Transit Authority (DART) included demolition of existing structures, the construction of on-grade and elevated structures including a 4,700 LF bridge over sensitive wetlands, and a structure over a major

BNSF Bridge & Approaches
Fort Worth, Texas

Burlington Northern / Santa Fe Bridge & Approaches Client: Fort Worth Transportation Authority (The “T”) Location: Fort Worth, Texas Construction: 2000—2001 This project was built for the Fort Worth Transportation Authority (“The T”) and consisted of construction of retaining walls, light rail bridges and excavation in Tarrant County, Texas. Work included drilled shafts, excavation, concrete

Berth 212 Wharf, Port of Tampa
Tampa, Florida

State Road 688 Bascule Bridge Client: Tampa Port Authority Location: Tampa, Florida Construction: 1998—1999 This project for the Tampa Port Authority included the construction of a 100′ by 750′ pier at the Port of Tampa, Florida. The pier was founded on 460 each prestressed 20″ concrete piles that supported cast-in-place concrete caps and precast concrete

State Road 688 Bascule Bridge
Largo, Florida

State Road 688 Bascule Bridge Client: Florida Department of Transportation, District 2 Location: Largo / Indian Rocks Beach, Florida Construction: 1997—2000 This project for the Florida Department of Transportation, District 2, included major widening of SR 688 and the construction of a new parallel bascule bridge across the Intracoastal Waterway in Largo, Florida. Also included

Victory Bridge
Sneads, Florida

Victory Bridge Client: Florida Department of Transportation, District 3 Location: Sneads, Florida Construction: 1994—1996 This project for the Florida Department of Transportation, District 3, included the construction of a new medium-level bridge across sensitive wetlands and the removal of the existing bridge across the Apalachicola River at Sneads, Florida. Items of work included drilled shafts,

Fuel Farm & Aircraft Apron
at US Coast Guard Station
Opa Locka, Florida

Fuel Farm & Aircraft Apron at US Coast Guard Station Client: United States Coast Guards Location: Opa Locka, Florida Construction: 1993 — 1997 The scope of work for this project for the United States Coast Guard included the construction of a 100,000 gallon fuel farm, a fuel distribution network, 22,000 SY of aircraft apron, a

Seabreeze Bridge
Daytona Beach, Florida

Seabreeze Bridge Client: Florida Department of Transportation, District 5 Location: Daytona Beach, Florida Construction: 1995—1998 The scope of work on this project for the Florida Department of Transportation, District 5, included the construction of two high-level segmental bridges over the Intracoastal Waterway in Daytona Beach. The two structures were each respectively 2,290 LF and 2,320

Berth 30 Crane Rail Extension
Port Everglades, Florida

Berth 30 Crane Rail Extension Client: Board of County Commissioners of Broward County, Port Everglades Authority Location: Port Everglades, Fort Lauderdale, Florida Construction: 1999—2000 This contract for the Board of County Commissioners of Broward County – Port Everglades Authority – was for the extension of the crane rails at Berth 30, to accommodate the arrival

Venetian Causeway – West Bridge Restoration
Miami, Florida

Venetian Causeway Bascule Bridge Restoration Client: Florida Department of Transportation, District 6 Location: Miami Beach, Florida Construction: 1997 — 1999 This project for the Florida Department of Transportation, District 6, consisted of the removal and replacement of a 2,000 LF structure across Biscayne Bay in Miami, Florida. Work included the removal of the existing bascule

Ras Laffan Port
Qatar

Parent Company Projects Ras Laffan Port Location: Qatar GLF SpA was a major partner of a Joint Venture in the construction of the Ras Laffan Port in Qatar. This project was part of the industrial complex for the utilization of natural gas derived from the North Field. The port mainly exports liquified natural gas. The

Iron Ore Berth
Jen Jen, Algeria

Parent Company Projects Port of Jen Jen – Iron Ore Berth Location: Jen Jen, Algeria This project for the Ministère des Travaux Publics de Wilaia de Jijel, Algeria, consisted of the construction of a 1,100 meter long iron ore berth, a 320 meter long “mixed” berth, a 775 meter long general cargo berth, a 223

Umiray Angat Tunnel
Philippines

Parent Company Projects Umiray Angat Tunnel Location: Philippines Grandi Lavori Fincosit constructed this complex underground project in the Philippines, in a mountainous area northward of Manila, hard to be reached and across very difficult terrain. This project consisted of a 13 km diversion tunnel having a diameter of 4.88 meters and excavated by TBM. This

Metro Station Milan
Italy

Parent Company Projects Milan to Bologna High Speed Rail Location: Milan, Italy Grandi Lavori Fincosit was awarded a major section of construction of the new high speed rail network from Milan to Bologna. The Venezia Station of the underground railway line of Milan, shown below, is part of this project. It is a unique work

Port of Brindisi Wharf
Brindisi, Italy

Parent Company Projects Costa Morena Wharf Location: Brindisi, Italy This project, constructed by Grandi Lavori Fincosit, consisted of a wharf-wall built with 34 cellular reinforced concrete caissons. The length of the wharf was 800 meters. This work also included the refurbishment of the previously damaged breakwaters protection, the construction of a new crown wall and

Port of Jen Jen
Algeria

Parent Company Projects Port of Jen Jen Client: Ministre des Travaux Publics Wilaja de Jijel (Algeria) Location: Algeria Construction: 1986 -1990 Total length of quays: 2,300 m of which 126 caissons were employed with height ranging from 12 to 19,50 m. Caissons in two different 22 and 15 m diameter sizes feature a protrusion perpendicular

Cable-Stayed Bridge for the High Speed Railway
Milano-Bologna, Italy

Parent Company Projects Cable-Stayed Bridge for the High Speed Railway Location: Milano-Bologna, Italy The works of the High Speed Railway Milano-Bologna consist of 180 Km of railroad in the northern part of Italy. In addition to the new line, the following was also part of the contract: 28 Km of interconnecting rails Strengthening and expansion

Vulcano Di Nola Super Center
Naples, Italy

Parent Company Projects Vulcano Di Nola Super Center Location: Naples, Italy This commercial center has the typical shape of a vulcano, and represents the nearby Vesuvio’s vulcano that surrounds the area. The total covered surface of 150,000 square meters makes the project, the largest commercial center in Europe. At the center of the crater lays

Port of Ascoli Piceno
New Marina of Port San Giorgio
Italy

Parent Company Projects Port of Ascoli Piceno – New Marina of Port San Giorgio Client: Società L’Approdo Location: Italy For the construction of the new Marina of Porto San Giorgio for yachts and fishing boats, located in the province of Ascoli Piceno, a Consortium was set up (Consorzio Lavori Porto S. Giorgio), led by Grandi

Port of Genoa – Multiple Projects
Italy

Parent Company Projects Pier for repair and fitting of ships up to 250,000 DWT Client: Officine Allestimento E Riparazione Navi E Cantieri Navali Location: Port of Genoa, Italy Construction Period: 1971 – 73 The pier on which two big cranes run is built on bearing elements featuring 10 large sized reinforced concrete cellular caissons, and

Port of Bari – Construction of Quay and Aprons
in the Western Dock
Italy

Port of Bari – Construction of Quay and aprons in the western dock Client: Autorità Portuale di Bari Location: Port of Bari, Italy The tender covers the construction of quays and aprons in the Western Dock of the Port of Bari for a total length of 805.40 m. The new quays consist of No. 25

Port of Livorno – New Italia Jetty
Parallel to Calata Alto Fondale
(Deep Draft Quay) – Italy

Parent Company Projects Construction of new Italia jetty parallel to Calata Alto Fondale (Deep Draft Quay) Client: Autorità Portuale di Livorno Location: Port of Livorno, Italy The works in question feature all works required for the construction of the new Italia jetty in the Port of Livorno. Reinforced concrete cellular caissons were employed to form

Port of Savona – Completion of Boselli Pier
Italy

Works conducted in compliance with the Master Plan of Savona Port, 4th Allotment. Completion of Boselli pier. Client: Autorità Portuale di Savona

Port of Savona
Revamping of Bulk Terminal
Italy

Parent Company Projects Port of Savona – Revamping of Bulk Terminal Client: TECHINT S.p.A. Location: Italy Completion Date: May 29, 2004 The works in question feature all works required for the construction of the new Italia jetty in the Port of Livorno. Reinforced concrete cellular caissons were employed to form the outside perimeter of the

Port of Brindisi
Costa Morena Eastern Jetty Italy

Port of Brindisi – Costa Morena Eastern Jetty Client: Autorità Portuale di Brindisi Location: Brindisi, Italy The intervention consists in the completion of the Eastern jetty of Costa Morena quay, as well as dredging of surrounding sea bed up to –14 m draft. The works comprise the continuation of the works already completed as part

Port of Civitavecchia – Extension works of
Cristoforo Colombo Breakwater
1st Allotment – Italy

Parent Company Projects Extension works of Cristoforo Colombo Breakwater – 1st Allotment Client: Autorità Portuale di Civitavecchia Location: Port of Civitavecchia, Italy The works mainly consisted in the prosecution almost rectilinear (deviation of 2 grades) of the main breakwater previously completed in 1991. The structure was designed as follows: A rubble mound base with a

Port of Ostia
Rome, Italy

Port of Ostia Location: Rome, Italy GLF SpA constructed the new Port of Rome built on the beach of Ostia. The port is a completely new Marina for pleasure boats only. This scope of work consisted of construction of more than 800 berths for 8 to 60-meter long boats, a 350-ton capacity travel lift, a

Port of Livorno
Dry-dock Italy

Parent Company Projects Port of Livorno – Dry-dock Client: Consorzio Livornese Bacini di Carenaggio Location: Port of Livorno, Italy The gravity dock is founded directly on the sea bed, consisting of closely alternated clay and sandy silty layers. In order to carry out the works at sea under dry conditions, a 1,250 long dam was

General Contracting

General Contracting – GLF Construction GLF Construction Corporation has completed many diverse general contracting projects including commercial and residential buildings, condominiums, industrial facilities, complex machinery and equipment installations, as well as general site work. Project: Royal Lexington Apartments Client: Royal Apartments USA, Inc. Location: Lexington, Kentucky Scope: Construction of a 96-unit condominium Construction: 1994 —