US-17 Wilmington Bypass

Our Projects

DART Northeast Corridor, Section G-2 Line

Client: Dallas Area Rapid Transit (DART)
Location: Dallas, Texas
Construction: 1999 — 2002

This project for the Dallas Area Rapid Transit Authority (DART) included demolition of existing structures, the construction of on-grade and elevated structures including a 4,700 LF bridge over sensitive wetlands, and a structure over a major section of the LBJ Freeway in Dallas. Also included were associated retaining and sound walls, storm drainage and at-grade stations.

Venetian Causeway Bascule Bridge

Major Quantities:

  • 5,000 LF of 48” Diameter Drilled Shafts
  • 2,142,342 LBS of Structural Steel
  • 55,047 SY of Reinforced Concrete Pavement
  • 57,847 SY of Reinforced Earth Wall
  • 18,780 LF of Type IV AASHTO Girders
  • 19,000 CY of Structural Concrete