SR 10 Escambia River Bridges

Client: Florida Department of Transportation, District 3
Location: Pace, Florida
Construction: 2001—2004

This project for the Florida Department of Transportation, District 3, included in the scope of work the widening of an existing structure to accommodate four lanes of traffic, a traffic switch to the widened bridge, followed by demolition of the adjacent structure and construction of a new high-level parallel span. Traffic was then moved to the new span while the main river crossing span on the widened older structure was demolished and replaced for a final configuration of three lanes northbound and three lanes southbound. The navigation channel on the Escambia River was increased to 90 feet.

Venetian Causeway Bascule Bridge

Major Quantities:

  • 10,486 M of 760 mm SQ Prestressed Piles
  • 5,600 M of 355 mm SQ Prestressed Piles
  • 4,368 M of Bulb Tee Girders (1,981 mm)
  • 355,000 KG Structural Steel