Our Projects
Blair Stone Parkway Road Extension - Phase I
Client: City of Tallahassee
Location: Tallahassee, Florida
Construction: 2001â2003
This contract for the City of Tallahassee, included the construction of 2.92 kilometers of a divided 4-lane urban roadway including the construction of twin 317 meter long precast concrete girder bridges across wetlands and a CSX railroad track. The project was originally bid as a segmental bridge but GLF's design-build proposal for the alternate bridge resulted in a significant savings to the City of Tallahassee.

Major Quantities:
- 4,500 M3 of Structural Concrete
- 4.283 M of 610 MM Prestressed Piles
- 2,601 M of 1,981 MM Modified Bulb âTâ

|