SR-453 (Wekiva Parkway) from System Interchange to SR-46 # 429-206, Lake County, FL


All Projects, Page 2

Client: Central Florida Expressway Authority
Location: Lake County, FL
Construction: 2016-2018

Project consisted of 1.68 miles of divided highway with 6 bridges. Two bridges call for 18” concrete pile, and four bridges are designed for HP 14×89 steel pile. Two bridges have Florida U Beams, two have rectangular concrete pre-stressed beams, and two have structural steel girders. The project also involves the installation of toll facilities, along with the clearing, earthwork, ponds, storm drainage, barrier walls, overhead signs, and pavement in accordance with the contract documents. Location: Lake County, FL

SR-453 Project, GLF Construction